Basuki Anondho, Pertama and Ayomi Dita Rarasati, Kedua and Yusuf Latief, Ketiga and Khrisna Mochtar, Keempat Probabilistic Construction Project Duration Prediction Models for High Rise Building Based on Earned Schedule Method in Jakarta. Probabilistic Construction Project Duration Prediction Models for High Rise Building Based on Earned Schedule Method in Jakarta.
Preview |
Text
BASUKI ANONDHO Probabilistic Construction Project Duration Prediction Models For High Rise Building Based on Earned Schedule Method In Jakarta TURNITIN.pdf Download (1MB) | Preview |
| Item Type: | Article |
|---|---|
| Subjects: | Artikel |
| Depositing User: | REKTORAT UNTAR |
| Date Deposited: | 13 May 2024 05:43 |
| Last Modified: | 13 May 2024 05:43 |
| URI: | https://repotest.untar.ac.id/id/eprint/43538 |
Actions (login required)
![]() |
View Item |
