Anondho, Basuki DENTIFIKASI FAKTOR PENGARUH DOMINAN KETERLAMBATAN PROYEK AKIBAT RANTAI PASOK PADA PENGADAAN PELAT BETON PRACETAK. JMTS (Jurnal Mitra Teknik Sipil).
Preview |
Text
IDENTIFIKASI FAKTOR PENGARUH DOMINAN KETERLAMBATAN PROYEK AKIBAT RANTAI PASOK PADA PENGADAAN PELAT BETON PRACETAK .pdf Download (2MB) | Preview |
Abstract
One way that can be done to speed up the duraon of the project is to use precast concrete slabs. However,
the use of precast concrete slab elements in the project can be ineffecve if in the order stage, producon
stage, unl the delivery stage of precast concrete elements to the project site is not managed properly, which
can cause delays in project duraon. Therefore, the use of precast concrete slabs is very dependent on the
supply chain management. To ancipate this risk, it is necessary to idenfy what are the dominant factors in
the supply chain that affect the procurement of precast concrete slabs which can cause delays in project
duraon. The inial influence factors were collected through a literature study and interviews with a number
of praconers, followed by a survey using a quesonnaire to a number of project actors in projects using
precast concrete slabs. The Likert scale 1-5 is used to measure the level of influence of a factor idenfied on
project delays. By using factor analysis techniques, as many as three groups of dominant supply chain factors
affecng the procurement of precast concrete slabs were found, namely special factors, technical factors,
and human error factors
| Item Type: | Article |
|---|---|
| Subjects: | Jurnal Penelitian |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | Puskom untar untar |
| Date Deposited: | 21 Dec 2023 07:51 |
| Last Modified: | 21 Dec 2023 07:51 |
| URI: | https://repotest.untar.ac.id/id/eprint/42460 |
Actions (login required)
![]() |
View Item |
