Nicholas, Nicholas (2020) Penjadwalan preventive maintenance dengan metode reliability centered maintenance meningkatkan kehandalan mesin line 5 pada pabrik pembuat sarung tangan latex (studi kasus PT. Haloni Jane) (T. Ind - 546). Skripsi thesis, Universitas Tarumanagara.
Full text not available from this repository.| Item Type: | Thesis (Skripsi) |
|---|---|
| Subjects: | Skripsi/Tugas Akhir Skripsi/Tugas Akhir > Fakultas Teknik |
| Divisions: | Fakultas Teknik > Teknik Industri |
| Depositing User: | TDI Family perpus |
| Date Deposited: | 26 Apr 2021 16:33 |
| Last Modified: | 26 Apr 2021 16:33 |
| URI: | https://repotest.untar.ac.id/id/eprint/22600 |
Actions (login required)
![]() |
View Item |
