Maryanto, Roenaldo (2018) Kesepadanan penerapan metode earned schedule terhadap durasi realisasi proyek konstruksi di Jakarta dan sekitarnya (TS - 2311). Skripsi thesis, Universitas Tarumanagara.
Full text not available from this repository.| Item Type: | Thesis (Skripsi) |
|---|---|
| Subjects: | Skripsi/Tugas Akhir Skripsi/Tugas Akhir > Fakultas Teknik |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | TDI Family perpus |
| Date Deposited: | 24 Apr 2021 10:15 |
| Last Modified: | 24 Apr 2021 10:15 |
| URI: | https://repotest.untar.ac.id/id/eprint/20323 |
Actions (login required)
![]() |
View Item |
