Wijaya, Andri (2008) Optimasi tenaga kerja dengan metode linear scheduling method pada konstruksi high rise building (TS - 2177). Skripsi thesis, Universitas Tarumanagara.
Full text not available from this repository.| Item Type: | Thesis (Skripsi) |
|---|---|
| Subjects: | Skripsi/Tugas Akhir Skripsi/Tugas Akhir > Fakultas Teknik |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | TDI Family perpus |
| Date Deposited: | 24 Apr 2021 05:21 |
| Last Modified: | 24 Apr 2021 05:21 |
| URI: | https://repotest.untar.ac.id/id/eprint/19894 |
Actions (login required)
![]() |
View Item |
