Putranto, Leksmono Suryo (2008) Operational Performance of Harmoni Transfer Point of the Jakarta Bus Rapid Transit Service. In: International Graduate Conference of the Engineering and Science, 23-24 Desember 2008, UTM Malaysia.

[thumbnail of 2008 Prosiding IGCES UTM.pdf]
Preview
Text
2008 Prosiding IGCES UTM.pdf - Published Version

Download (608kB) | Preview

Abstract

The Jakarta Bus Rapid Transit (BRT) service has
been in operation in seven lines. The busiest transfer
point is the Harmoni stop connecting line 1, line 2 and
line 3. To anticipate high activities of both buses and
passengers, this stop has a unique design compare to
the other stops. However the stop has not been wellmanaged.
There is no system to ensure that boarding
passengers are in queue. In order to be able to propose
better design of the stop, in this paper the operational
performance the stop is evaluated. An observation is
made on the Harmoni stop at the normal working from
6.30 to 20.00. The following operational performances
are observed, i.e. time headway between buses on each
line, stopping duration, number of boarding
passengers and number of queuing passengers. These
can be used for designing suitable queuing system and
for optimizing the lay out of Harmoni stop.

Item Type: Conference or Workshop Item (Paper)
Subjects: Penelitian
Penelitian > Fakultas Teknik
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Leksmono suryo putranto
Date Deposited: 17 May 2018 13:01
Last Modified: 16 Apr 2021 03:24
URI: https://repotest.untar.ac.id/id/eprint/1844

Actions (login required)

View Item View Item