Waty, Mega and Sulistio, Hendrik Road construction project waste material recommendations. Road construction project waste material recommendations.

[thumbnail of buktipenelitian_10318005_20A182429.pdf] Text
buktipenelitian_10318005_20A182429.pdf

Download (1MB)

Abstract

After risk identification and risk analysis done, so risk response is carried out.
Risk response is handled by the service provider. Recommendation is the final result of risk
management of road construction project waste material. The recommendation is the
aggregate B and Ready Mix Concrete is necessary to pay attention to the waiting time
and pay attention to the critical trajectory on material scheduling so that breakdowns and
scheduling updates are made per week. Need to pay attention to rainfall and implementation
methodology. Recommendations for lean concrete waste material are necessary to pay
attention to the waiting time and pay attention to the critical trajectory on material
scheduling so that breakdowns and scheduling updates are carried out per week. Need to
pay attention to rainfall and implementation methodology. And the causes for minimizing
waste material must be considered.

Item Type: Article
Subjects: Penelitian > Fakultas Teknik
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Puskom untar untar
Date Deposited: 22 Dec 2020 14:00
Last Modified: 22 Dec 2020 14:00
URI: https://repotest.untar.ac.id/id/eprint/13819

Actions (login required)

View Item View Item