Gozali, Lina and Widodo, Lamto and Sudiarta, Natalia and Sukania, I Wayan Kanban System and Calculation of Kanban Production in Stamping Division of PT. XYZ. Kanban System and Calculation of Kanban Production in Stamping Division of PT. XYZ.

[thumbnail of buktipenelitian_10306002_6A154635.pdf] Text
buktipenelitian_10306002_6A154635.pdf

Download (268kB)

Abstract

This far, the development of Japan industry has
grown rapidly in the world. The automotive industry is one of the
industry which play the important role in Indonesia, especially in
transportation sector. Almost in automotive companies familiar
with Toyota Production System method. The problem come up
when the production planning use forecasting method, then the
amount of the inventory will cause a lot of reject products and
need a lot of storage spaces. One of the solution can solve this
problem is the production planning department should control
and monitor the number of kanban requirement to complete the
task job. When the production planning fix the kanban number,
then key performance index perform better. The purpose of this
study is to calculate the amount of kanban for each line of
production, then this calculation will reduce waste and increases
the production capacity.

Item Type: Article
Subjects: Penelitian > Fakultas Teknik
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Puskom untar untar
Date Deposited: 21 Dec 2020 12:13
Last Modified: 21 Dec 2020 12:13
URI: https://repotest.untar.ac.id/id/eprint/13740

Actions (login required)

View Item View Item